Pre Treatment Plant


Pre-treatment Clarifier, Ideal Power, Nagpur

MBE has a manufacturing unit in Bangalore for Thickeners and Clarifiers. The total number of installations of Thickeners is approximately 200. Presently, MBE is executing large capacity Pre-Treatment Plants for NTPC Super Thermal Power Projects in various locations. In these projects Reactor Clarifier/Tube settlers are also incorporated. Some installations :

  • NTPC Rihand Super Thermal Power Project, Stage II ( 2X660 MW). Water Treatment Package.
  • NTPC Barh Super Thermal Power Project (2 X 660 MW), Water Pre treatment Package.
  • NTPC Mauda Super Thermal Power Project (2 X 500 MW), Water Pre treatment Package.
  • NTPC, Mejia Super Thermal Power Project (2 X 660 MW), Water treatment package

 

 

Filtration Plant

MBE commissions Rapid Gravity Sand Filter and Pressure Filters as a part of large turnkey projects.

 

Demineralization Plant


Demineralizing Plant, Ideal Power

MBE has executed a number of Demineralization plants:

  • IISCO, Burnpur for their complete External Water System for Basic Oxygen Furnace (BOF) and CCP (Continuous Casting plant).
  • DM Water Package for 2 X 363 MW Power Plant for NTPC-BHEL Power Projects Pvt Ltd, Tripura.
  • DM Plant for Ideal Power Nagpur (1 X 270 MW)
  • DM plant for MPPDCL Satpura (2 X 250 MW)

 

Side Stream Filter


Side Stream Filter

MBE does Side stream filters as part of large turnkey Projects, including Valve less Auto Gravity filters (VAG).

 

Waste Water/ Effluent Treatment Plant / Sewerage Treatment Plant


Effluent Treatment Plant

Having in-house manufacturing facility for thickeners, filter press and slurry pumps, MBE is offering complete Sewerage Treatment Plants with disposal network. MBE has executed a project in Jaipur in Rajasthan. MBE has executed on Turnkey Basis a 1400m3/hr Slurry Treatment and Waste Water treatment Plant for the 3000 TPD Lead-Zinc Beneficiation Plant at the Rampura-Agucha mines of Hindusthan Zinc Limited. Even now this project is regarded as a benchmark by experts in the field.

  • MBE commissioned the first Indian Washery way back in 1979. This project, executed on Turnkey basis, included a 1400m3/hr Waste Water Treatment Plant.

  • MBE has also executed the Ash Water Recirculation System for Talcher Thermal Power Station of National Thermal Power Station Ltd (NTPC).

 

 

Sea Water Desalination Plant

In association with leading International companies, MBE is capable of participating in various Membrane based Sea / Brackish Water Desalination Projects. MBE is now capable of putting up large Desalination Plants with sea water intake on turn key basis and energy recovery systems, with more than 90% efficiency.

 

Water Transmission Distribution System


Water Distribution

C.W.S.S. to 674 Rural Habitation in Manappanai and Marun-gapuri Unions and Ponnampatty RTP in Trichy District.
  • For the Punjab State Electricity Board, MBE has commissioned the extension of the existing Ash Slurry, Plant Drainage, and Sludge Pipe-line.

  • Slurry Pipe Line System at the Bailadila Mines of National Mineral Development Corporation Limited has been executed by MBE.

  • MBE has commissioned one of the largest combined Water Supply Schemes in the state of Tamil Nadu covering 674 habitations in Trichy District for Tamil Nadu Water Supply & Drainage Board, Chennai. The scheme has an 8 meter diameter Collector Well, 1000 km. pipeline of upto 700 mm. diameter, 470 Over Head Tanks, 31 Sumps and Pump Houses.

  • Water Distribution project involving 12 km. MS Pipeline of 600mm to 1200 mm diameter and 45 km. DI pipeline of 450 mm and 500 mm diameter, for the Ahmedabad Municipal Corporation.

  • Intake structure and 600 mm diameter MS wrapped pipeline – 3.6 km long – for INDAL at Hirakud.

  • MBE has executed Water Distribution System in Jodhpur for RUIDP. The project involved commissioning 210 km AC and DI pipeline.

  • Water distribution system in Ajmer city for RUIDP involving 98 km of AC & DI pipeline.

 

 

 

River Water Intake System


Raw Water Intake Structure and Associated Work for 100 MW Expansion of Power Plant – Unit #2 at Hirakud, Orissa, for Indian Aluminum Company.

MBE has executed an 8 Meter diameter Collector well at the Cauvery River bed including the foot bridge in 2004.

 

 

Mill Reject System

The scale laden water received from the Casting Plant is treated in settling tanks with scale and oil removal facilities / Mill scale pressure filters and is cooled in Cooling Towers. After treatment it is sent back to the plant for utilization in various processes like the spray system, machine cooling system etc. MBE is presently executing a scale removal system for a Steel Plant.