Construction Infrastructure

MBE owns most of the major construction equipment that are located at various sites –

Civil - Hydraulic Piling Rigs, Excavators, Rock- Breakers, Dumpers, Compactors, Batching Plants, Transit Mixers, Concrete pumps, Total stations etc.

Structural & Mechanical - Tower cranes, Crawler cranes, Gantry Cranes, Hydras, Winches, Hydraulic Jacks, Diesel Gensets, Welding m/cs etc.

With nearly 1000 construction engineers (Civil, Structural, Mechanical, Electrical & Instrumentation) posted at various project sites and large teams of workers and supervisors working in these locations at any given point in time, MBE is capable of taking up construction projects of any size.

MBE undertakes a wide range of civil construction activities that include simple jobs like the construction of boundary walls to building modern highways and specialized structures like silos, bunkers, tunnels, track hoppers, heavy machine foundations etc. MBE is capable of executing more than 400,000 cubic metres of concreting in a year in addition to driving cast in situ piles for more than 10000 numbers in a year through high capacity Rotary Rigs and conventional methods.

Structural fabrication

Be it fabrication of industrial buildings of more than 75 mts height or equipment structures of 90 mts height, MBE makes it all possible. MBE is capable of fabricating over 100,000 MT of steel in a year.

Piping, Ducting & Utilities

With experience in completing process piping and utilities in more than 350 EPC projects MBE is capable of undertaking projects involving CS / SS/ AS / Aluminum / Copper / PVC / HDPE / RCC / PSC / AC / GI piping and ducting for Dust Extraction and Suppression systems, HVAC systems, Firefighting systems, Piping systems for slurry /water / reagent /steam lines, process piping of all industries e.g., Refineries, Petrochemicals, Fertilizers etc.

MBE is capable of fabrication and installation of more than 1.5 million Inch diameter of UNIT / OFFSITE Piping work in one year and more than 400 KM of Cross country pipeline in a year for various services.

Equipment Erection / Installation Works

With experience in completing more than 350 EPC projects, MBE is capable of handling and installing static and rotary equipment from below grade level to a height of 100 M using the most modern methods.

Tankage Work

MBE with its expertise in the construction industry is capable of fabricating and installing medium to large size Floating Roof, Cone Roof, Dome Roof and Open Air Steel Storage tanks with an average output of 15000 Mt per year.

Electrical & Instrumentation

MBE has the expertise to construct substations and switchyard control rooms, cabling, earthing, and lighting.

Erection & Commissioning

The Goliath cranes standing 90 mts tall and 90 mts wide at Cochin shipyard and the 1750 MT, 700 Ltr. bucket wheel excavator at Neyveli Lignite Corp. stand testimony to the erection skills of MBE. MBE erects over 3000 MT of equipment in a year. Complete plants have been erected and commissioned in less than 3 months’ time from the time various equipment has been delivered at site.

Storage Tanks, Ideal Energy Storage Tanks, Ideal Energy
Storage Tank Storage Tank
300 Tonne Goliath Gantry Crane Erection at Cochin Shipyard 300 Tonne Goliath Gantry Crane Erection at Cochin Shipyard
Switchyard Switchyard
CW Pump BOP Satpura CW Pump BOP Satpura
BPCL Mahul Pipework BPCL Mahul Pipework
Silo at GAP Plant, Vedanta, Jharsuguda Project Silo at GAP Plant, Vedanta, Jharsuguda Project